By Solution


Kākāriki Hospital – Healthcare Lighting Control

  • Sector: Healthcare
  • System: zencontrol
  • Status: In Progress
Healthcare lighting control
  • End Client: Kakariki Private Hospital
  • Architect: Klein Limited
  • Engineer: Norman Disney Young
  • Electrical Contractor: Allendale Electrical
  • Controls Specialist: Bel Arevalo

Design of the healthcare lighting control system for this project is underway, with commissioning commencing once the build is further progressed and DALI-2 components installed.
#DALI #lighting control

Read More...

DALI for Lighting Control at Taranaki Base Hospital

  • Sector: Healthcare | Hospital
  • Solution: zencontrol DALI-2 system
  • Status: Design Stage
DALI for lighting system
  • End Client: Te Whata Ora Health New Zealand | Taranaki Base Hospital
  • Builder: Leighs Construction
  • Engineer: Beca
  • Architect: Warren & Mahoney
  • Electrical Contractor: HEL Rimu
  • Controls Specialist(s): Andrew Thompson | Ian Rose

The 6 levels of the new East Wing building will contain 102 DALI networks and the zencontrol system will incorporate more than 40 controllers, 900 sensors, and hundreds of switches including push buttons, rotary dimmers, RGB scene sets, and LCD smart panels.

Read More...

Lighting Control for Aged Care Facilities – Summerset St Johns

  • Sector: Healthcare | Aged Care
  • Solution: zencontrol DALI-2 system
  • Status: In Progress
lighting control for aged care
  • End Client: Summerset Group Holdings Ltd
  • Engineer: Norman Disney Young
  • Electrical Contractor: Strike Electrical (Building A) |Caldwell & Levesque (Buildings D, E + basement)
  • Controls Specialist(s): Manu Bhagwanji

We consider the ability to monitor and maintain the control system remotely, with no requirement to attend site to be a significant benefit for buildings with vulnerable residents or patients. This has become particularly important in recent years with the threat of Covid-19 being introduced by visitors/tradespeople being of considerable concern.

Read More...

Intelligent Lighting System for New Distribution Centre

  • Sector: Warehouses | Offices | Industrial
  • Solution: zencontrol DALI-2 system
  • Status: In Progress
intelligent lighting system
  • End Client: NZ Post
  • Builder: Federal Construction
  • Architect: Williams
  • Engineer: Electrical Consulting Services (ECS)
  • Electrical Contractor: Callander Electrics
  • Controls Specialist(s): Manu Bhagwanji

The Roma Road Estate will target a Green Star rating of at least five stars. The new buildings will feature the latest design innovations, including sustainable building materials and energy-efficient technologies. NZ Post is the first of these buildings to be constructed, with a new 17,700m2 design-build property solution.

Read More...

DALI-2 Lighting Management for Commercial Office Development

  • Sector: Commercial Offices
  • Solution: zencontrol DALI-2 system
  • Status: In Progress
DALI-2 Lighting Management
  • End Client: Asset Plus Investments
  • Builder: Icon
  • Architect: Ignite
  • Engineer: Beca (Basebuild | Agile (Fitout Council Hub)
  • Electrical Contractor: Bishman
  • Controls Specialist(s): Manu Bhagwanji

6-8 Munroe Lane, Albany is a brand new 26,500m2 (GFA) commercial office development consisting of 1.5 levels of basement and 6 levels of A-grade commercial office space.

Read More...

Light Management for Orams Marine Services Workshops

  • Sector: Other | Boat Storage + Servicing
  • Solution: zencontrol DALI-2 system
  • Status: Complete
Light Management for Orams
  • End Client: Orams Marine Centre
  • Architect: RTA Studio
  • Engineer: Electrical Consulting Services (ECS)
  • Electrical Contractor: East Coast Bays Electrical Services
  • Controls Specialist(s): Manu Bhagwanji | Julian Beckham

The Wynyard Quarter location known as Site 18 on the corner of Beaumont and Jellicoe Streets has been transformed into a centre for Orams Marine that includes a superyacht refit facility, incorporating a travel lift shed.

Read More...

Mercedes Benz Showroom – Smart Building Solution

  • Sector: Retail
  • Solution: zencontrol DALI-2 system
  • Status: Complete
smart building solution
  • End Client: Mercedes-Benz North Shore
  • Builder: Savory Construction
  • Architect: Warren and Mahoney
  • Engineer: WSP
  • Electrical Contractor: Coll Electrical
  • Controls Specialist(s): Manu Bhagwanji | Julian Beckham

Intelligent Environments were contracted by Coll Electrical to provide the smart building solution for the control of the lighting for this exciting new dealership on Auckland’s North Shore.

Read More...

Lighting Management System for Waka Kotahi, Wellington

  • Sector: Government
  • System: zencontrol
  • Status: In Progress
lighting management system
  • End Client: Waka Kotahi - NZTA
  • Engineer: Norman Disney Young
  • Electrical Contractor: Seven Electrical Wellington
  • Controls Specialist: Ian Rose | Andrew Thompson

Lighting control within Waka Kotahi’s new premises will adopt a hybrid approach comprising a combination of standalone 230v presence detectors and a DALI-2 lighting management system controlling functional areas.

Read More...